Basic Site and Installation Planning
As you plan for basic site and installation requirements, consider the following:
- Does the installation site have adequate power for the routing system?
- Can the routing system be positioned close to the AC or DC power source, and are the power receptacles easy to reach?
- Does the site have appropriate equipment racks with space available in which to install the system? Are additional equipment racks required?
- Is there a scissor lift or similar lifting device available to lift the chassis into the equipment rack?
In addition, make sure that the installation site meets the following access requirements:
- At least 36 inches (92 cm) of clearance exists between rows of equipment racks. This space is needed to access components in the chassis. Additional clearance may be necessary for installation.
- Enough room exists for the system console terminal, and that the console cable is long enough to reach the routing system from the terminal.
- Fan tray exhaust vents are not blocked, and airflow at the bottom of the chassis is not blocked.
When planning the site, you should think about potential expansion of the system. Consider the following:
- Equipment rack space for additional chassis
- Power and cooling requirements for additional chassis
- Cable management for routing system cables