Refreshing Site Connectivity Information
Any infrastructure changes, such as adding and removing spines or changing spine node IDs, require a Multi-Site fabric connectivity site refresh. This section describes how to pull up-to-date connectivity information directly from each site's APIC.
Procedure
Step 1 |
Log in to the Cisco Nexus Dashboard Orchestrator GUI. |
Step 2 |
In the Main menu, select . |
Step 3 |
In the top right of the main Infra Configuration view, click the Configure Infra button. |
Step 4 |
In the left pane, under Sites, select a specific site. |
Step 5 |
In the main window, click the Refresh button to pull fabric information from the APIC. |
Step 6 |
(Optional) For on-premises sites, in the Confirmation dialog, check the box if you want to remove configuration for decommissioned spine switch nodes. If you choose to enable this checkbox, all configuration info for any currently decommissioned spine switches will be removed from the database. |
Step 7 |
Finally, click Yes to confirm and load the connectivity information. This will discover any new or removed spines and all site-related fabric connectivity will be re-imported from the APIC. |