PDF(138.7 KB) View with Adobe Reader on a variety of devices
Updated:July 27, 2011
Document ID:1518436718387631
Bias-Free Language
The documentation set for this product strives to use bias-free language. For the purposes of this documentation set, bias-free is defined as language that does not imply discrimination based on age, disability, gender, racial identity, ethnic identity, sexual orientation, socioeconomic status, and intersectionality. Exceptions may be present in the documentation due to language that is hardcoded in the user interfaces of the product software, language used based on RFP documentation, or language that is used by a referenced third-party product. Learn more about how Cisco is using Inclusive Language.
EOL2970-Amended
Cisco announces the end-of-sale and end-of life dates for the Selective Cisco Catalyst 650010/100 Line Cards, Gigabit Ethernet Line Cards, Power Supplies, and Power Entry Module. The last day to order the affected product(s) is January 13, 2006. Customers with active service contracts will continue to receive support from the Cisco Technical Assistance Center (TAC) as shown in Table 1 of the EoL bulletin. Table 1 describes the end-of-life milestones, definitions, and dates for the affected product(s). Table 2 lists the product part numbers affected by this announcement. For customers with active and paid service and support contracts, support will be available until the termination date of the contract, even if this date exceeds the Last Date of Support shown in Table 1.
Table 1. End-of-Life Milestones and Dates for the Selective Cisco Catalyst 650010/100 Line Cards, Gigabit Ethernet Line Cards, Power Supplies, and Power Entry Module
Milestone
Definition
Date
End-of-Llfe Announcement Date
The date the document that announces the end of sale and end of life of a product is distributed to the general public.
July 15, 2005
End-of-Sale Date
The last date to order the product through Cisco point-of-sale mechanisms. The product is no longer for sale after this date.
January 13, 2006
Last Ship Date: HW
The last-possible ship date that can be requested of Cisco and/or its contract manufacturers. Actual ship date is dependent on lead time.
April 13, 2006
End of SW Maintenance Releases Date: HW
The last date that Cisco Engineering may release any final software maintenance releases or bug fixes. After this date, Cisco Engineering will no longer develop, repair, maintain, or test the product software.
January 13, 2007
End of Routine Failure Analysis Date: HW
The last-possible date a routine failure analysis may be performed to determine the cause of hardware product failure or defect.
January 13, 2007
End of New Service Attachment Date: HW
For equipment and software that is not covered by a service-and-support contract, this is the last date to order a new service-and-support contract or add the equipment and/or software to an existing service-and-support contract.
January 13, 2007
End of Service Contract Renewal Date: HW
The last date to extend or renew a service contract for the product.
April 10, 2010
Last Date of Support: HW
The last date to receive service and support for the product. After this date, all support services for the product are unavailable, and the product becomes obsolete.
January 31, 2011
HW = Hardware OS SW = Operating System Software App. SW = Application Software
Table 2. Product Part Numbers Affected by This Announcement
End-of-Sale Product Part Number
Product Description
Replacement Product Part Number
Replacement Product Description
Additional Information
PEM-15A-AC
EOS:01/15/06(PB 2970) Pwr Entry Mod for Cat 6503 (950W AC)
PWR-2700-AC/4
2700W AC Power Supply for Cisco 7604/6504-E
--
PWR-950-AC
EOS:01/15/06(PB 2970)950W AC P/S for Cisco 7603 and Cat 6503
PWR-2700-AC/4
2700W AC Power Supply for Cisco 7604/6504-E
--
PWR-950-AC=
EOS:01/15/06(PB 2970)950W AC P/S for Cisco 7603/C6503, spare
PWR-2700-AC/4
2700W AC Power Supply for Cisco 7604/6504-E
--
WS-CAC-1000W
EOS:01/15/06(PB 2970) Catalyst 6500 1000W AC Power Supply
WS-CAC-3000W
Catalyst 6500 3000W AC power supply
--
WS-CAC-1000W=
EOS:01/15/06(PB 2970) C 6500 1000W AC Power Supply, spare
WS-CAC-3000W=
Catalyst 6500 3000W AC power supply (spare)
--
WS-CAC-2500W
EOS:01/15/06(PB 2970) Catalyst 6500 2500W AC Power Supply
WS-CAC-3000W
Catalyst 6500 3000W AC power supply
--
WS-CAC-2500W=
EOS:01/15/06(PB 2970) Cat 6500 2500W AC Power Supply, spare
WS-CAC-3000W=
Catalyst 6500 3000W AC power supply (spare)
--
WS-X6348-RJ-45
EOS:01/15/06(PB 2970)C6500 48-p 10/100,Upgrd. to Voice,RJ-45
WS-X6148-RJ-45
Catalyst 6500 48-Port 10/100, Upgradable to Voice, RJ-45
--
WS-X6348-RJ-45=
EOS:01/15/06(PB 2970)C6500 48 port 10/100,RJ-45, spare
WS-X6148-RJ-45=
Catalyst 6500 48-Port 10/100, Upgradable to Voice, RJ-45
The recommended replacements for the Cisco EOS products are listed in Table 3.
Customers may be able to use the Cisco Technology Migration Program (TMP) where applicable to trade-in eligible products and receive credit toward the purchase of new Cisco equipment. For more information about Cisco TMP, customers should work with their Cisco Partner or Cisco account team. Cisco Partners can find additional TMP information on Partner Central at
http://www.cisco.com/web/partners/incentives_and_promotions/tmp.html
Customers may be able to continue to purchase the Selective Cisco Catalyst 650010/100 Line Cards, Gigabit Ethernet Line Cards, Power Supplies, and Power Entry Module through the Cisco Certified Refurbished Equipment program. Refurbished units may be available in limited supply for sale in certain countries on a first-come, first-served basis until the Last Date of Support has been reached. For information about the Cisco Certified Refurbished Equipment program, go to:
http://www.cisco.com/go/eos
Service prices for Cisco products are subject to change after the product End of Sale date.
The Cisco Takeback and Recycle program helps businesses dispose properly of surplus products that have reached their end of useful life. The program is open to all business users of Cisco equipment and its associated brands and subsidiaries. For more information, go to:
http://www.cisco.com/web/about/ac227/ac228/ac231/about_cisco_takeback_recycling.html
Any authorized translation issued by Cisco Systems or affiliates of this end-of-life Product Bulletin is intended to help customers understand the content described in the English version. This translation is the result of a commercially reasonable effort; however, if there are discrepancies between the English version and the translated document, please refer to the English version, which is considered authoritative.