PDF(132.8 KB) View with Adobe Reader on a variety of devices
Updated:July 22, 2011
Document ID:1518436780704695
Bias-Free Language
The documentation set for this product strives to use bias-free language. For the purposes of this documentation set, bias-free is defined as language that does not imply discrimination based on age, disability, gender, racial identity, ethnic identity, sexual orientation, socioeconomic status, and intersectionality. Exceptions may be present in the documentation due to language that is hardcoded in the user interfaces of the product software, language used based on RFP documentation, or language that is used by a referenced third-party product. Learn more about how Cisco is using Inclusive Language.
EOL6886-Amended
Cisco announces the end-of-sale and end-of life dates for the Selected Cisco Catalyst 6500 Series Line Cards and Power over Ethernet (PoE) Daughter Cards. The last day to order the affected product(s) is March 31, 2010. Customers with active service contracts will continue to receive support from the Cisco Technical Assistance Center (TAC) as shown in Table 1 of the EoL bulletin. Table 1 describes the end-of-life milestones, definitions, and dates for the affected product(s). Table 2 lists the product part numbers affected by this announcement. For customers with active and paid service and support contracts, support will be available until the termination date of the contract, even if this date exceeds the Last Date of Support shown in Table 1.
Table 1. End-of-Life Milestones and Dates for the Selected Cisco Catalyst 6500 Series Line Cards and Power over Ethernet (PoE) Daughter Cards
Milestone
Definition
Date
End-of-Life Announcement Date
The date the document that announces the end of sale and end of life of a product is distributed to the general public.
September 30, 2009
End-of-Sale Date
The last date to order the product through Cisco point-of-sale mechanisms. The product is no longer for sale after this date.
March 31, 2010
Last Ship Date: HW
The last-possible ship date that can be requested of Cisco and/or its contract manufacturers. Actual ship date is dependent on lead time.
June 29, 2010
End of Routine Failure Analysis Date: HW
The last-possible date a routine failure analysis may be performed to determine the cause of hardware product failure or defect.
March 31, 2011
End of New Service Attachment Date: HW
For equipment and software that is not covered by a service-and-support contract, this is the last date to order a new service-and-support contract or add the equipment and/or software to an existing service-and-support contract.
March 31, 2011
End of Service Contract Renewal Date: HW
The last date to extend or renew a service contract for the product.
June 26, 2014
Last Date of Support: HW
The last date to receive service and support for the product. After this date, all support services for the product are unavailable, and the product becomes obsolete.
March 31, 2015
HW = Hardware OS SW = Operating System Software App. SW = Application Software
Table 2. Product Part Numbers Affected by This Announcement
End-of-Sale Product Part Number
Product Description
Replacement Product Part Number
Replacement Product Description
Additional Information
WS-X6816-DFC3A=
Cat6500 16-port GE,2 fab I/F,DFC3A for SUP720 ONLY(Req GBIC)
WS-F6700-DFC3A
Catalyst 6500 Dist Fwd Card for WS-X67xx modules
-
WS-X6816-DFC=
Cat6500 16-port GE,2 fab I/F,DFC for SUP2 ONLY (Req GBIC)
WS-F6700-DFC3C
Catalyst 6500 Dist Fwd Card for WS-X67xx modules
-
Product Migration Options
Customers are encouraged to migrate to the products suggested in the bulletin. Information about these products can be found at:
http://www.cisco.com/en/US/products/hw/switches/ps708/prod_bulletins_list.html. Support for the legacy end-of-service line cards is provided in Cisco Catalyst OS 8.7 and Cisco IOS Software Release 12.2(33)SXH.
Customers may be able to use the Cisco Technology Migration Program (TMP) where applicable to trade-in eligible products and receive credit toward the purchase of new Cisco equipment. For more information about Cisco TMP, customers should work with their Cisco Partner or Cisco account team. Cisco Partners can find additional TMP information on Partner Central at
http://www.cisco.com/web/partners/incentives_and_promotions/tmp.html
Customers may be able to continue to purchase the Selected Cisco Catalyst 6500 Series Line Cards and Power over Ethernet (PoE) Daughter Cards through the Cisco Certified Refurbished Equipment program. Refurbished units may be available in limited supply for sale in certain countries on a first-come, first-served basis until the Last Date of Support has been reached. For information about the Cisco Certified Refurbished Equipment program, go to:
http://www.cisco.com/go/eos
Service prices for Cisco products are subject to change after the product End of Sale date.
The Cisco Takeback and Recycle program helps businesses dispose properly of surplus products that have reached their end of useful life. The program is open to all business users of Cisco equipment and its associated brands and subsidiaries. For more information, go to:
http://www.cisco.com/web/about/ac227/ac228/ac231/about_cisco_takeback_recycling.html
Any authorized translation issued by Cisco Systems or affiliates of this end-of-life Product Bulletin is intended to help customers understand the content described in the English version. This translation is the result of a commercially reasonable effort; however, if there are discrepancies between the English version and the translated document, please refer to the English version, which is considered authoritative.